200,000 sq ft / 120,000 sq ft of raised floor
Ten diesel generators capable of 19 megawatts of power
2 OC3/s to 2 different providers (2 more being added in the next year).
6 400 ton cooling towers
Lots of tape storage (3 rotary tape libraries, 2 linear tape libraries, 1 1500 sq ft room full of manual tape delivery, lots of offsite tapes)
330 terabytes of hard drive storage in the storage cabinets (does not count the drives in the machines).
Just for Travis, we have 2 Xerox 4635 printers in the copy center.
In addition, everything was immaculate.